Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 
YR

CLIENT

PROJECT NAME

SCOPE OF WORK

KVA

Contract
MB
1994-1995

Taikisha
(New Thai Kenzisha)

Pathumwan Princess
Hotel, Bangkok

Bldg. Electrical Work NA 9.3 30.7
1997

Vanward Electronics
Plant, Cholburi

Water Treatment Sanitary System

NA 0.4
1999-2000

IBM Sriracha

Turnkey EE Power & Instrumentation

NA 8.0
1999

S12, 13, 14 MTRA

  NA 1.0
2000

NS Electronics

  NA 6.0
2001 San Ei Electronics Plant (Phase I)   NA 4.0
2002

San Ei Electronics Plant (Phase II)

  NA 2.0
1999

Tipco Asphalt
Pub. Co.

Polymer Mixed Asphalt
Process Plant, Pisanulok

Process Design, Machinery, Piping, All Electrical Work and Automation

NA 8.5 34.5
2000

Emulsion  Plant
Racol, Rayong

Renovation for Machinery, Piping, All Electrical Work NA 1.5
2001

Emulsion  Plant
Korat

Process Design, Machinery, Piping, All Electrical Work and Automation Control

NA 11.5
2002

PMA Plant,
Export to China

Process Design, Machinery, Piping, All Electrical Work and Automation Control NA 12.5
1997

Thai Kawasaki Motor

Frame Assembly Plant, Rayong

ME & EE & PLC panel & Automation NA 5.5 10.0
1998 Machine Assembly Plant, Rayong ME & EE & PLC panel & Automation NA 4.5

1995 -1996

Siam Lime Group, Saraburi Lime Shaft Kiln NO.2 Hydrated Lime Plant Grinding plant

Turnkey EE Power T/R, MDB & MCC , PLC Panel, Co-oversea  Know how For  PLC Software, DCS and installation of Instruments, Plus Steel Structure work

5000   53.6
1999

Jalaprathan Cement

Sub Station, Nakornsawan

Grounding System for  115KV Station. NA 2.3 14.0
2000

EP Tower & Raw Meal
Transport, Nakornsawan

Install & Test run  EE Power & Instrumentation

1000 1.7
2001

Preheating Tower ,Rotary kiln, TAKLI

Install & Test run  Kiln, EE Power & Instrumentation

2500 10
1998 Siam Cement

Pump Barge Ship 1&2

Turnkey EE Power & Instrumentation

NA 3 15.3
1999

Pump Barge Ship 3

Turnkey EE Power & Instrumentation

NA 1.5
1999

Siam Yamato Movable Hot-Saw #3, Rayong

EE Power & Control, Instrumentation

NA 1.3
2000

Modification of Kangkoy Cement Plant

Turnkey EE Power & Instrumentation

NA 2.5
2000

Barge Loading Taloung Plant

Turnkey EE Power & Instrumentation

NA 3.5
2001

Modification of Talan Cement Plant

Turnkey EE Power & Instrumentation

NA 2.0
2002

Modification of Taloung Cement Plant

Turnkey EE Power & Instrumentation

NA 3.5
1997-98

Quality Mineral
Group

Ground Calcite Plant
Lopburi

Turnkey EE Power & Co-oversea For  PLC, DCS & Instrumentation

4000 13 2.4
1998

Packing Plant and Office Bldg., Lopburi

Turnkey EE Power & Co-oversea For  PLC & Instrumentation

500 3
2000 Yuasan Furniture Plant ; Chacheongsao

Civil Work, Machinery, Piping, All Electrical Work

NA      8.0
2000 Yuasan Furniture Plant ; Chacheongsao

Civil Work, Machinery, Piping, All Electrical Work

NA      8.0

2000-2003

Surint Omya Chemical

Ground Calcite Plant, Lopburi

Civil works NA 0.8 2.3

GCC Loading Silo, Samuthprakarn

ME & EE & PLC panel & Automation NA 0.65
Ground Calcite Plant, Ball Mill B Line , Lopburi EE Power & Instrument Installation NA 0.85
1993 Jardine Queen Park Casa, Bangkok

Building Electrical System: design, Install and test

NA 2.0  
1994

Temp Tech

Sea Bonanza Plant, Samuthsakorn

Freezing Room Electrical: design, Install and test

500 3.0  
1994

Esso Standard (Thailand)

Environmental Bldg., Cholburi

EE Power & Installation NA 3.5  
1995 Quality House

Royal Sathorn Bldg., Bangkok

Air Conditioning System EE Water Treatment

NA 4.0  
1995

Auto System Technology Rayong

Gold Pine Tower,Bangkok

Bldg. Electrical Work 1000 6.7  
1997-98 Universal Rice Mill

Rice Packing Plant, Mahachai

Turnkey EE  MCC, Automation
System, SCADA & Instrumentation

1250 6.4  
2000

Asok Chemical

Coal Grinding Plant  Saraburi

Civil Work, Machinery, Piping, NA 14.5  
2002 Seacon Square

Seacon Expansion

Turnkey EE Power & Instrumentation

NA 3.5  
2002

Thai ShinRyo

S12, 13, 14 MRTA

System Finishing, EE works NA 0.4  0.9
S15, 16, 17 MRTA NA 0.4 5

2002-2005

Zolar Asphalt

Polymer Mixed Asphalt
Process Plant, Rajburi

Process Design, Machinery, Piping, All Electrical, Computer Control and Automation

NA 12.5 14.0
Emulsion Plant SCADA Control conversion project NA 1.5
2003 Sigma&Hearts Co.,Ltd.

New factory A&B

Turnkey EE Power & Ligthing system

1500 3.5  
2003 Mold Tech Asia Industry Ltd.

New factory

Turnkey EE Power & Ligthing system

300 1.5  
YR

CLIENT

PROJECT NAME

SCOPE OF WORK

KVA

Contract
MB
2003

ESSILOR
Manufacturing Ladkrabang

Process renovation , EE

EE Power & Ligthing system,
CE  ME EE  Water Cooled Chiller Design,

NA 12.5 129.0
2004

Process renovation , EE &
Civil  Works

EE Power & Ligthing system,
For Process Machine & New Chiller Plant , Room & Partition Renovation w/ Insulation Panel

NA 7.0
2005

Process renovation , EE &
Civil  Works

EE Power & Lighting system, For Process Machine & New Chiller Plant , Room & Partition Renovation w/ Insulation Panel

NA 5.0
2005 -2006

HVAC Clean Room Class10K  1.67MR7 MR8

Turnkey Design &Build HVAC for Clean Room Cls 10K EE Power MDB, MCC Lighting NA 16.0
2006

HVAC Clean Room Class10K  HMC1-2

Turnkey Design &Build HVAC for Clean Room Cls 10K NA 6.0
2006

HVAC , EE System, Utilities  Work , New Partition Room : RX LAB

Turnkey Design &Build HVAC for Clean Room Cls 10K EE Power , Lighting, Piping Works , Room Renovation NA 12.0
2006

HVAC , EE System, Utilities  Work , New Partition Room : MR8 15K & 26K

Turnkey Design &Build HVAC for Clean Room Cls 10K EE Power MDB, MCCs , Lighting, Piping Works , Room Renovation, Epoxy Floor NA 33
2006

HVAC ,  1.67Casting & Polymerized Oven room

Turnkey Design & Build HVAC for Clean Room Cls 10K NA 5.0
2007

Cold Room Project

Build new 5 Cold Rooms with Rock Wool Panel , Explosion Proof Type NA 8.5

2007 -2008

RX LAB 4 ML Project

Turnkey design & Built UT, EE, & CE works NA 16.5
2007 -2008 MILCF Workshop Turnkey design & Built UT, EE, & CE works NA 10.0
2008

RX LAB Expansion Project, EOLT

Turnkey design & Built UT, EE, & Exhaust Works NA 8.0
YR

CLIENT

PROJECT NAME

SCOPE OF WORK

KVA

Contract
MB

2003- 2004

LV Technology

CIMA Cement Plant  Malaysia

Turnkey EE Power and Instrumentation for Cement & Coal Upgrading Plant

2500 13.5

18.5

CEMEX Thailand Co.,Ltd. (Cement Plant) Saraburi

Turnkey EE Power and Automation System for New Roto Packing Plant 500 4.5

Sharoud Cement Plant
IRAN

PLC Cabinet Supply NA 0.5
2004

Saint Gobain SEKURIT

Cold Room 1 Turnkey EE System for Cold Room NA 0.55  
2004

Siam CMI Recycling

New Factory Turnkey EE System for Whole Factory 1250 2.8  
2004 Siam City Concrete Ready Mixed Plant Installation , Renovation , Overhall Machine and EE System NA 2.5  

2004

Asia Cement Concrete Prod. Ready Mixed Plant Turnkey Design and Build Sand & Limestone Transportation System NA 0.7  
2004

EKARAT Engineering

Solar Module Factory  Turnkey Design and Build EE System for The whole plant  1250 7.5 8.25
MDB , MCC , Feeder Replace MDB, MCC & M/C Feeder NA 0.75
2004 Taikisha Co.,Ltd Big C , Samrong

EE Power for HVAC , Ligthing system Grounding Ligthning Arrestor System

NA 2.0  
2004

Saint Gobain SEKURIT

Cold Room 2 Turnkey EE System for Cold Room NA 0.72  
2004

Toyo Denso

Machine Cold Room 2 Turnkey EE System for M/C Cold room NA 0.5  
2004-05 Kornthai Co.,Ltd. EE Power for Sprey Dryer Plant MCC , Cable , Instruments and  commissioning NA 1.8  
2005 Taikisha Co.,Ltd. World Trade Center EE Power  and Control for HVAC   NA 14  

2004 -2005

Surint Omya Chemical

GCC Loading Silo 2, For  Plastic  Products

ME & EE & PLC panel & Automation NA 0.6 4.1

GCC Loading Silo ,For  BKK PVC & NPC

GCC Loading System Turnkey Design & Build : SILO, Gate, Chute ,EE System MCC &PLC Panel, Instruments

NA 3.5
2005

Fujikura Co., Ltd.

EE Power & Piping work for New M/C Expansion

EE Power  and Piping work 

NA  1.5  

2005-2006

DARAMIC Thailand

Phase 2 Filter Expansion

Turnkey EE Power, HV , MDB, MCC (Siemens)  Lighting, Grounding System 2500 20.3 99.3

2007-2008

Phase 3  Filter Expansion

Turnkey EE Power and Control , HV , MDB, MCC (Siemens), HMI (Automation),  Lighting  & Grounding System , 2500  79

2006 -2007

Triumph Aviation services Painting Room Turnkey Design& Build ; Room Partition and Full UT System NA 2.5  
2005

CEMEX Thailand

Dust Collector K1 & K2

Turnkey EE Power & Automation Control ( SCADA) , 2 MCC & PLC(Siemens S7) Cabinets  NA 7.0 40
2006

Raw Mill  K1 & K2

Replace MCC & PLC(Siemens S7) Cabinets for Raw Mill Department   8.5
2007

Kiln 1 Revamping

Replace all Power and Control Cable  for Kiln production line   25.0
2006 M&W Zander (Thailand)

EE system for Air Plain Repair Factory

Turnkey Design & Build EE System for New Factory 5000 20  
2007-2008 SOLARTRON SOLAR CELL FACTORY Turnkey Design & Build M&E Works 2500   84.5
2008

TOL/TEA/PTT UDE Shedden IETL

HVAC for TOL Turnkey  HVAC for LAB Room ; TOL NA 1.0 16.7
Piping & Grounding Work for TEA; RAYONG Piping & Grounding  System for TEA (PTT Group) , under Ude Shedden Project Management & IETL (Main Civil) NA 15.7
2008

ESSILOR LAB AMATA

Essilor Optical Lab. Turnkey Design + Build for EE&UT System for NewPROCESS MACHINES NA 8.0  
2008

ESSILOR Mnfg Ladkrabang

Plant Renovation EE, CIVIL & UT Works for Machines NA 10.0
2009

ESSILOR Mnfg Ladkrabang

Plant Renovation EE, CIVIL & UT Works for Machines NA 22.5
2009

ESSILOR LAB AMATA

Utilities, EE&ME Works EE, Automation ,Civil & Pipings Works for Machines NA 2.5
2009 Nissan Car Park 100 Rai Auto Logics, LamChaBang TurnKey Design&Build  EE Work 650 23.5
2009

DARAMIC Thailand

Plant Renovation Turnkey Design & Build EE System & Automation for Process Line 2&3 NA 4.5
Packing Plant Extension Turnkey EE Power & Automation NA 0.75  
2010 General Motors (Thailand) J200 & J300 Production  Line EE power and Utilities Relocation Works NA 7.6  
2010

ESSILOR Mnfg Ladkrabang

Plant Renovation Turnkey Design & Build EE System & UT Works for Machines, Chiller Plant NA 12.5  
2010

ESSILOR LAB AMATA

Utilities, EE&ME Works Utilities Works for Machines NA 2.4  
2010

ESSILOR LAB India

Control Panel, PLC Power & Automation Panel for Waste Treatment Plant NA 0.5  
2010 Kokia Engineering Patumthani Nuitrition Mixing Plant Turnkey Design & Build EE System & Automation Works NA 3.2  
2010 Ude Shedden IRPC Refinery Plant HVAC System for CCR Building NA 1.35  
2010

DARAMIC Thailand

Plant Renovation EE System & Automation for Process Modification NA 4.0  
IBM Sriracha
NS Electronics
Pump Barge Ship 3
Ground Calcite Plant Lopburi
Seacon Expansion
S12, 13, 14 MRTA
Emulsion Plant
New factory A&B
Cold Room Project
Free counter and web stats Home | About Us | Projects Summary | Service | Client reference | Contact us
Copyright 2010-2011 © Mechatric Co.,Ltd.