YR |
CLIENT |
PROJECT NAME |
SCOPE OF WORK |
KVA |
Contract |
MB |
1994-1995 |
Taikisha (New Thai Kenzisha) |
Pathumwan Princess Hotel, Bangkok |
Bldg. Electrical Work |
NA |
9.3 |
30.7 |
1997 |
Vanward Electronics Plant, Cholburi |
Water Treatment Sanitary System |
NA |
0.4 |
1999-2000 |
IBM Sriracha |
Turnkey EE Power & Instrumentation |
NA |
8.0 |
1999 |
S12, 13, 14 MTRA |
|
NA |
1.0 |
2000 |
NS Electronics |
|
NA |
6.0 |
2001 |
San Ei Electronics Plant (Phase I) |
|
NA |
4.0 |
2002 |
San Ei Electronics Plant (Phase II) |
|
NA |
2.0 |
1999 |
Tipco Asphalt Pub. Co. |
Polymer Mixed Asphalt Process Plant, Pisanulok |
Process Design, Machinery, Piping, All Electrical Work and Automation |
NA |
8.5 |
34.5 |
2000 |
Emulsion Plant Racol, Rayong |
Renovation for Machinery, Piping, All Electrical Work |
NA |
1.5 |
2001 |
Emulsion Plant Korat |
Process Design, Machinery, Piping, All Electrical Work and Automation Control |
NA |
11.5 |
2002 |
PMA Plant, Export to China |
Process Design, Machinery, Piping, All Electrical Work and Automation Control |
NA |
12.5 |
1997 |
Thai Kawasaki Motor |
Frame Assembly Plant, Rayong |
ME & EE & PLC panel & Automation |
NA |
5.5 |
10.0 |
1998 |
Machine Assembly Plant, Rayong |
ME & EE & PLC panel & Automation |
NA |
4.5 |
1995 -1996 |
Siam Lime Group, Saraburi |
Lime Shaft Kiln NO.2 Hydrated Lime Plant Grinding plant |
Turnkey EE Power T/R, MDB & MCC , PLC Panel, Co-oversea Know how For PLC Software, DCS and installation of Instruments, Plus Steel Structure work |
5000 |
|
53.6 |
1999 |
Jalaprathan Cement |
Sub Station, Nakornsawan |
Grounding System for 115KV Station. |
NA |
2.3 |
14.0 |
2000 |
EP Tower & Raw Meal Transport, Nakornsawan |
Install & Test run EE Power & Instrumentation |
1000 |
1.7 |
2001 |
Preheating Tower ,Rotary kiln, TAKLI |
Install & Test run Kiln, EE Power & Instrumentation |
2500 |
10 |
1998 |
Siam Cement |
Pump Barge Ship 1&2 |
Turnkey EE Power & Instrumentation |
NA |
3 |
15.3 |
1999 |
Pump Barge Ship 3 |
Turnkey EE Power & Instrumentation |
NA |
1.5 |
1999 |
Siam Yamato Movable Hot-Saw #3, Rayong |
EE Power & Control, Instrumentation |
NA |
1.3 |
2000 |
Modification of Kangkoy Cement Plant |
Turnkey EE Power & Instrumentation |
NA |
2.5 |
2000 |
Barge Loading Taloung Plant |
Turnkey EE Power & Instrumentation |
NA |
3.5 |
2001 |
Modification of Talan Cement Plant |
Turnkey EE Power & Instrumentation |
NA |
2.0 |
2002 |
Modification of Taloung Cement Plant |
Turnkey EE Power & Instrumentation |
NA |
3.5 |
1997-98 |
Quality Mineral Group |
Ground Calcite Plant Lopburi |
Turnkey EE Power & Co-oversea For PLC, DCS & Instrumentation |
4000 |
13 |
2.4 |
1998 |
Packing Plant and Office Bldg., Lopburi |
Turnkey EE Power & Co-oversea For PLC & Instrumentation |
500 |
3 |
2000 |
Yuasan Furniture Plant ; Chacheongsao |
Civil Work, Machinery, Piping, All Electrical Work |
NA |
8.0 |
2000 |
Yuasan Furniture Plant ; Chacheongsao |
Civil Work, Machinery, Piping, All Electrical Work |
NA |
8.0 |
2000-2003 |
Surint Omya Chemical |
Ground Calcite Plant, Lopburi |
Civil works |
NA |
0.8 |
2.3 |
GCC Loading Silo, Samuthprakarn |
ME & EE & PLC panel & Automation |
NA |
0.65 |
Ground Calcite Plant, Ball Mill B Line , Lopburi |
EE Power & Instrument Installation |
NA |
0.85 |
1993 |
Jardine |
Queen Park Casa, Bangkok |
Building Electrical System: design, Install and test |
NA |
2.0 |
|
1994 |
Temp Tech |
Sea Bonanza Plant, Samuthsakorn |
Freezing Room Electrical: design, Install and test |
500 |
3.0 |
|
1994 |
Esso Standard (Thailand) |
Environmental Bldg., Cholburi |
EE Power & Installation |
NA |
3.5 |
|
1995 |
Quality House |
Royal Sathorn Bldg., Bangkok |
Air Conditioning System EE Water Treatment |
NA |
4.0 |
|
1995 |
Auto System Technology Rayong |
Gold Pine Tower,Bangkok |
Bldg. Electrical Work |
1000 |
6.7 |
|
1997-98 |
Universal Rice Mill |
Rice Packing Plant, Mahachai |
Turnkey EE MCC, Automation System, SCADA & Instrumentation |
1250 |
6.4 |
|
2000 |
Asok Chemical |
Coal Grinding Plant Saraburi |
Civil Work, Machinery, Piping, |
NA |
14.5 |
|
2002 |
Seacon Square |
Seacon Expansion |
Turnkey EE Power & Instrumentation |
NA |
3.5 |
|
2002 |
Thai ShinRyo |
S12, 13, 14 MRTA |
System Finishing, EE works |
NA |
0.4 |
0.9 |
S15, 16, 17 MRTA |
NA |
0.4 5 |
2002-2005 |
Zolar Asphalt |
Polymer Mixed Asphalt Process Plant, Rajburi |
Process Design, Machinery, Piping, All Electrical, Computer Control and Automation |
NA |
12.5 |
14.0 |
Emulsion Plant |
SCADA Control conversion project |
NA |
1.5 |
2003 |
Sigma&Hearts Co.,Ltd. |
New factory A&B |
Turnkey EE Power & Ligthing system |
1500 |
3.5 |
|
2003 |
Mold Tech Asia Industry Ltd. |
New factory |
Turnkey EE Power & Ligthing system |
300 |
1.5 |
|
YR |
CLIENT |
PROJECT NAME |
SCOPE OF WORK |
KVA |
Contract |
MB |
2003 |
ESSILOR Manufacturing Ladkrabang |
Process renovation , EE |
EE Power & Ligthing system, CE ME EE Water Cooled Chiller Design, |
NA |
12.5 |
129.0 |
2004 |
Process renovation , EE & Civil Works |
EE Power & Ligthing system, For Process Machine & New Chiller Plant , Room & Partition Renovation w/ Insulation Panel |
NA |
7.0 |
2005 |
Process renovation , EE & Civil Works |
EE Power & Lighting system, For Process Machine & New Chiller Plant , Room & Partition Renovation w/ Insulation Panel |
NA |
5.0 |
2005 -2006 |
HVAC Clean Room Class10K 1.67MR7 MR8 |
Turnkey Design &Build HVAC for Clean Room Cls 10K EE Power MDB, MCC Lighting |
NA |
16.0 |
2006 |
HVAC Clean Room Class10K HMC1-2 |
Turnkey Design &Build HVAC for Clean Room Cls 10K |
NA |
6.0 |
2006 |
HVAC , EE System, Utilities Work , New Partition Room : RX LAB |
Turnkey Design &Build HVAC for Clean Room Cls 10K EE Power , Lighting, Piping Works , Room Renovation |
NA |
12.0 |
2006 |
HVAC , EE System, Utilities Work , New Partition Room : MR8 15K & 26K |
Turnkey Design &Build HVAC for Clean Room Cls 10K EE Power MDB, MCCs , Lighting, Piping Works , Room Renovation, Epoxy Floor |
NA |
33 |
2006 |
HVAC , 1.67Casting & Polymerized Oven room |
Turnkey Design & Build HVAC for Clean Room Cls 10K |
NA |
5.0 |
2007 |
Cold Room Project |
Build new 5 Cold Rooms with Rock Wool Panel , Explosion Proof Type |
NA |
8.5 |
2007 -2008 |
RX LAB 4 ML Project |
Turnkey design & Built UT, EE, & CE works |
NA |
16.5 |
2007 -2008 |
MILCF Workshop |
Turnkey design & Built UT, EE, & CE works |
NA |
10.0 |
2008 |
RX LAB Expansion Project, EOLT |
Turnkey design & Built UT, EE, & Exhaust Works |
NA |
8.0 |
YR |
CLIENT |
PROJECT NAME |
SCOPE OF WORK |
KVA |
Contract |
MB |
2003- 2004 |
LV Technology |
CIMA Cement Plant Malaysia |
Turnkey EE Power and Instrumentation for Cement & Coal Upgrading Plant |
2500 |
13.5 |
18.5 |
CEMEX Thailand Co.,Ltd. (Cement Plant) Saraburi |
Turnkey EE Power and Automation System for New Roto Packing Plant |
500 |
4.5 |
Sharoud Cement Plant IRAN |
PLC Cabinet Supply |
NA |
0.5 |
2004 |
Saint Gobain SEKURIT |
Cold Room 1 |
Turnkey EE System for Cold Room |
NA |
0.55 |
|
2004 |
Siam CMI Recycling |
New Factory |
Turnkey EE System for Whole Factory |
1250 |
2.8 |
|
2004 |
Siam City Concrete |
Ready Mixed Plant |
Installation , Renovation , Overhall Machine and EE System |
NA |
2.5 |
|
2004 |
Asia Cement Concrete Prod. |
Ready Mixed Plant |
Turnkey Design and Build Sand & Limestone Transportation System |
NA |
0.7 |
|
2004 |
EKARAT Engineering |
Solar Module Factory |
Turnkey Design and Build EE System for The whole plant |
1250 |
7.5 |
8.25 |
MDB , MCC , Feeder |
Replace MDB, MCC & M/C Feeder |
NA |
0.75 |
2004 |
Taikisha Co.,Ltd |
Big C , Samrong |
EE Power for HVAC , Ligthing system Grounding Ligthning Arrestor System |
NA |
2.0 |
|
2004 |
Saint Gobain SEKURIT |
Cold Room 2 |
Turnkey EE System for Cold Room |
NA |
0.72 |
|
2004 |
Toyo Denso |
Machine Cold Room 2 |
Turnkey EE System for M/C Cold room |
NA |
0.5 |
|
2004-05 |
Kornthai Co.,Ltd. |
EE Power for Sprey Dryer Plant |
MCC , Cable , Instruments and commissioning |
NA |
1.8 |
|
2005 |
Taikisha Co.,Ltd. |
World Trade Center |
EE Power and Control for HVAC |
NA |
14 |
|
2004 -2005 |
Surint Omya Chemical |
GCC Loading Silo 2, For Plastic Products |
ME & EE & PLC panel & Automation |
NA |
0.6 |
4.1 |
GCC Loading Silo ,For BKK PVC & NPC |
GCC Loading System Turnkey Design & Build : SILO, Gate, Chute ,EE System MCC &PLC Panel, Instruments |
NA |
3.5 |
2005 |
Fujikura Co., Ltd. |
EE Power & Piping work for New M/C Expansion |
EE Power and Piping work |
NA |
1.5 |
|
2005-2006 |
DARAMIC Thailand |
Phase 2 Filter Expansion |
Turnkey EE Power, HV , MDB, MCC (Siemens) Lighting, Grounding System |
2500 |
20.3 |
99.3 |
2007-2008 |
Phase 3 Filter Expansion |
Turnkey EE Power and Control , HV , MDB, MCC (Siemens), HMI (Automation), Lighting & Grounding System , |
2500 |
79 |
2006 -2007 |
Triumph Aviation services |
Painting Room |
Turnkey Design& Build ; Room Partition and Full UT System |
NA |
2.5 |
|
2005 |
CEMEX Thailand |
Dust Collector K1 & K2 |
Turnkey EE Power & Automation Control ( SCADA) , 2 MCC & PLC(Siemens S7) Cabinets |
NA |
7.0 |
40 |
2006 |
Raw Mill K1 & K2 |
Replace MCC & PLC(Siemens S7) Cabinets for Raw Mill Department |
|
8.5 |
2007 |
Kiln 1 Revamping |
Replace all Power and Control Cable for Kiln production line |
|
25.0 |
2006 |
M&W Zander (Thailand) |
EE system for Air Plain Repair Factory |
Turnkey Design & Build EE System for New Factory |
5000 |
20 |
|
2007-2008 |
SOLARTRON |
SOLAR CELL FACTORY |
Turnkey Design & Build M&E Works |
2500 |
|
84.5 |
2008 |
TOL/TEA/PTT UDE Shedden IETL |
HVAC for TOL |
Turnkey HVAC for LAB Room ; TOL |
NA |
1.0 |
16.7 |
Piping & Grounding Work for TEA; RAYONG |
Piping & Grounding System for TEA (PTT Group) , under Ude Shedden Project Management & IETL (Main Civil) |
NA |
15.7 |
2008 |
ESSILOR LAB AMATA |
Essilor Optical Lab. |
Turnkey Design + Build for EE&UT System for NewPROCESS MACHINES |
NA |
8.0 |
|
2008 |
ESSILOR Mnfg Ladkrabang |
Plant Renovation |
EE, CIVIL & UT Works for Machines |
NA |
10.0 |
2009 |
ESSILOR Mnfg Ladkrabang |
Plant Renovation |
EE, CIVIL & UT Works for Machines |
NA |
22.5 |
2009 |
ESSILOR LAB AMATA |
Utilities, EE&ME Works |
EE, Automation ,Civil & Pipings Works for Machines |
NA |
2.5 |
2009 |
Nissan Car Park 100 Rai |
Auto Logics, LamChaBang |
TurnKey Design&Build EE Work |
650 |
23.5 |
2009 |
DARAMIC Thailand |
Plant Renovation |
Turnkey Design & Build EE System & Automation for Process Line 2&3 |
NA |
4.5 |
Packing Plant Extension |
Turnkey EE Power & Automation |
NA |
0.75 |
|
2010 |
General Motors (Thailand) |
J200 & J300 Production Line |
EE power and Utilities Relocation Works |
NA |
7.6 |
|
2010 |
ESSILOR Mnfg Ladkrabang |
Plant Renovation |
Turnkey Design & Build EE System & UT Works for Machines, Chiller Plant |
NA |
12.5 |
|
2010 |
ESSILOR LAB AMATA |
Utilities, EE&ME Works |
Utilities Works for Machines |
NA |
2.4 |
|
2010 |
ESSILOR LAB India |
Control Panel, PLC |
Power & Automation Panel for Waste Treatment Plant |
NA |
0.5 |
|
2010 |
Kokia Engineering Patumthani |
Nuitrition Mixing Plant |
Turnkey Design & Build EE System & Automation Works |
NA |
3.2 |
|
2010 |
Ude Shedden |
IRPC Refinery Plant |
HVAC System for CCR Building |
NA |
1.35 |
|
2010 |
DARAMIC Thailand |
Plant Renovation |
EE System & Automation for Process Modification |
NA |
4.0 |
|